Project details
In 2018, GROB is building a two-storey production hall with a total height of 20 m and a floor area of 15,000 m². The requirements on the ceiling at over 9.50 m were extremely high due to minimal permissible vibrations. The fact that the ceiling could be driven over by a 10-tonne forklift made the planning even more difficult.