Project details
In the course of the new construction of the PM5 paper machine, the wastewater treatment plant of the Lang paper mill in Ettringen was extended by 180,000 population equivalents. A third treatment stage, known as ozonation, was also built to meet the high requirements for waste water quality.
SCHUSTER engineering was responsible for the entire civil engineering as general construction planner.